Construction Documents

SHARED INFRASTRUCTURE

Here are the Project Documents for the second round of project advertisements.

This page is a work in progress. Additional information coming soon.

20210817_PLANS AND SPECIFICATIONS APPROVAL-SHARED INF. CONTRACTS (DEEP Approval to Advertise)

20210818_Stamped and Signed Shared Force Main & Bioxide Plan Set
20210818_Stamped and Signed Shared Force Main & Bioxide_Volume 1 Project Manual
20210818_Stamped and Signed Shared Force Main & Bioxide_Volume 2 Project Manual
20210818_Stamped and Signed Shared Pump Station_Plan Set
20210818_Stamped and Signed Shared Pump Station_Volume 1 Project Manual
20210818_Stamped and Signed Shared Pump Station_Volume 2 Project Manual
20210818_Stamped and Signed Shared Shoreline Trunk Sewer_Plan Set
20210818_Stamped and Signed Shoreline Trunk Sewer_Volume 1 Project Manual
20210818_Stamped and Signed Shoreline Trunk Sewer_Volume 2 Project Manual

OLSBA INTERNAL GRAVITY SEWER

20210903_PLANS AND SPECIFICATIONS APPROVAL_OLSA_signed

20210910_Stamped and Signed OLSBA Internal Sewer Project Project Manual Volume 1
20210910_Stamped and Signed OLSBA Internal Sewer Project Project Manual Volume 2.
20210910_Stamped and Signed OLSBA Internal Sewer Project Plan Set
20210910_OLSBA Internal Sewer Project Restoration Drawings

BID DOCUMENTS – OCTOBER 2021

(note these are draft documents with known mathematical errors identified)

20211025_DRAFT OLSBA Overall Project Cost Breakdown (1).pdf

DRAFT_Bid Summary & Tabulation_Force Main and Bioxide Project

DRAFT_Bid Summary & Tabulation_Old Lyme Pump Station Project

DRAFT_Bid Summary & Tabulation_OL Shoreline Trunk Sewer and Flow Mtr Station Proj.

DRAFT_Bid Summary & Tabulation_OLSBA