This post provides links to all current bid-related documents for the Shared Infrastructure which includes the pump house, odor control station, and forced main line from Sound View to East Lyme.
Bid Process Timeline:
April 13: DEEP approval to advertise
April 19: Bid Advertisement is posted
May 1: Pre-bid meeting
May 19: Commence bid opening/bid evaluation (F&O)
Bid Documents and Addenda
Old Lyme Shared Infrastructure_Project Manual Volume 1 of 2
Old Lyme Shared Infrastructure_Project Manual Volume 2 of 2
Old Lyme Shared Infrastructure_Project_Contract Drawings Stamped
Shared Infrastructure_Addendum 1 of 4
Shared Infrastructure_Addendum 2 of 4
Shared Infrastructure_Addendum 3 of 4
Shared Infrastructure_Addendum 4 of 4